Photography — 1866-1867
The construction of the Metropolitan District Railway
Roofing over a cutting to form twin tunnels. The method of construction can clearly be seen, with five rings of brick arching being laid over two steel frames. From a series of 64 photographs taken in the late 1860s by Henry Flather to document the construction of the railway from Paddington to Blackfriars via Kensington, Westminster and the new Victoria Embankment. Construction was by the 'cut-and-cover' method used to build the first underground railways before the development of the tunnelling shield by James Henry Greathead. The first tunnelled, or 'tube', railway in London was the City & South London Line, which opened in 1890.
- Category:
- Photography
- Object ID:
- IN37522
- Object name:
- The construction of the Metropolitan District Railway
- Object type:
- Artist/Maker:
- Flather, Henry
- Related people:
- —
- Related events:
- —
- Related places:
- —
- Production date:
- 1866-1867
- Material:
- paper, card
- Measurements/duration:
- H 190 mm, L 239 mm (image size), H 318 mm, L 418 mm (mounted)
- Part of:
- —
- On display:
- —
- Record quality:
- 100%
- Part of this object:
- —
- Credit:
- Purchased with the assistance of the Art Fund and the MLA PRISM Grant Fund
- Copyright holder:
- digital image © London Museum
- Image credit:
- —
- Creative commons usage:
- —
- License this image:
To license this image for commercial use, please contact the London Museum Picture Library.